infernicalminecraft infernicalminecraft
  • 01-11-2019
  • Mathematics
contestada

To complete a job a crew of 8 people needs 18 days. How long will the same job be finished if the crew will have 9 people?

Respuesta :

rockyrules789 rockyrules789
  • 01-11-2019

Answer:

16

Step-by-step explanation:

.

Answer Link
lajfoaofje lajfoaofje
  • 27-06-2020

Answer:

16

Step-by-step explanation:

Answer Link

Otras preguntas

The heat of fusion for a substance is 122 joules per gram. How many joules of heat are need to melt 7.50 grams of this substance at its melting point?
How is the structure of Congress different under the articles of confederation and the constitution?
What is the average distance from the sun (in AU's) of an astroid with an orbital period of 8 years?
Cuanto es diez más diez
A 10-foot ladder leans against a wall. It hits the wall 9 feet up. How far is the base of the ladder from the wall? Apply the Pythagorean Theorem to this proble
julia's hair is 4cm long. Her hair grows 1.5cm per month. Julia wants her hair to grow at least 7cm long. Write an inequality to determine the number of month
I have a swollen lymph node and I haven’t touched or some anything to it and it’s getting smaller, is that good?
I need 5 differences between a citizen an alien​
What organelles are required for a paramecium to survive in its environment?
Find the y-coordinate of the vertex: f(2) = 2^2- 4(2) - 5.