matttmoney1221 matttmoney1221
  • 02-06-2016
  • Business
contestada

​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

Each day 1/2 of the money that is in bank value is removed. No money is added to the value. Which of the following represent the situation? A. linear function
If some of the gas bubbles from the reaction had escaped out the bottom of the tube, how would this have affected your value for R?
there is a total of 98 democratic and republican senators in congress. 8 of them are republican women. Find the percentage
Which three lines in this poem indicate that the poetic speaker refuses to be beguiled by love any longer?
why does the sun seen to rise and set
factorise a^4 -(a+b)^4
Work out (8 x 10^-3) * (2 x 10^-4) Give your answer in standard form.
(8xy) exponent negative 2 times x negative exponent 5 times y negative exponent 1 divided xy
Find the distance from (4,2) to (7,6)​
LATITUDE 61°N LONGHITUDE149°WWhat is the CITY-CONTINENT Of that?​