Sadeghshakeri97 Sadeghshakeri97
  • 02-12-2019
  • Mathematics
contestada

60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

I WILL GIVE YOU BRAINLIST AND 20 POINTS IF YOU HELP ME ON MY 2 QUESTION QUIZ PLZZ HELPhow does the views of the speakers neighbor in mending wall help develop i
Genetic engineering requires a.bacteria b. Fungi c.plants d. algae
Find the distance between the points: (-5, 7) and (4, -2)
Two cyclists start from the same point at the same time and move in opposite directions. One cyclist is traveling at 7 mph, and the other cyclist is traveling
Can anyone help me in this question!!
From the passage "why do people laugh " please answer the following question!
Contrast and compare written sources of history from non-written sources of history .
i need help with this math ​
Which describes why the declartion of independace was written? A. To justify separating from britian. B. To form a new government. C. To create laws to prote
9. Translate: The product of x and y. a) с) ху b) 2(xy) d) (x) + (y)