In an activity-based costing system, what should be used to assign a department’s manufacturing overhead costs to products produced in varying lot sizes?

Respuesta :

Remzwisdom
Remzwisdom Remzwisdom
  • 03-03-2020

Answer: Multiple cause-and- effect relationship should be used

Explanation:

A multiple cause-effect relationship is a relationship in which an event (the cause) makes another event happen (the effect).

A particular cause can have several effects.

Answer Link

Otras preguntas

What are the 4 main products for southeast
What is the slope of (2,3) , (6,7)
HOW TO FIND THE MISSING NUMERATOR IN ANY FRACTIONS LIKE 4/8=  ?/4
HOW TO FIND THE MISSING NUMERATOR IN ANY FRACTIONS LIKE 4/8=  ?/4
List the perfect squares between 100 and 500 that are even numbers.
2 friends want to equally share 4/3 feet of rope.What length of rope should ea friend get?
How did New England's physical geography help the growth of industries?
Why did populations soar between 1800 and 1900?
The distance of a wave crest from its resting. position is its. out of A. Wavelength B. Amplitude C. Height
What is the Geocentric theory in your own words?