katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

what are the coordinates of the vertex for f(x) =3x^2+6x+3
Which sentence states a property or a definition used in the construction of a perpendicular bisector? A line that intersects a line segment at an angle of 90
where is the blue point on the number line
Second row second column solve for 6c
Which one is the following processes can occur in the absence of oxygen
A line that passes through point (3,7) and has a slope of 3/4. The equation of the line is ? If point a(x,5) lies on the line , the value of x is ?
What is a benefit of increased physical fitness?
which shows an internal conflict? (1 point)a character struggles with a decision two characters disagree about a plan a character disagrees with a common view a
Camel humps are an adaptation for _______.
Find the measures of the numbered angles for each parallelogram.