adoflotorres adoflotorres
  • 03-07-2020
  • Computers and Technology
contestada

Which field can be used to track the progress on tasks that a user has created?
Subject
Start Date
Due Date
% Complete
Help plz

Respuesta :

elitrad
elitrad elitrad
  • 03-07-2020

Answer:

% complete

Explanation:

% complete tracks progress (how far done you are, aka completion)

Answer Link
deliaaaxox deliaaaxox
  • 07-07-2020
Percent complete will be used to track progress on task that the user has created :))
Answer Link

Otras preguntas

Through (-2, -2) parallel to 2y-x=7
What are the (3) most common elements that bond together to form organic compounds?
what is the reference angle of 330° degrees
I am trying to find the magnitude of a resultant vector. Do i take inconsideration the negatives when i find the x & y components of the two vectors
18x-(8x-7)=67 what does 'x' equal in this equation?
Eddie is 7 years older than Brian.  If Brian is x years old, then how old was Eddie 11 years ago?
food A contains 150 calories in 3/4 of a serving. food B contains 250 calories in 2/3 of a serving. which food has fewer calories per serving?
$0.90x + $8 = (16 + x)($0.65)
Lisa is standing on a dock beside a lake. She drops a rock from her hand into the lake. After the rock hits the surface of the lake, the rock's distance from th
members of which phylum contain stinging capsules that poison the entangled prey