medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

One beaker contains 19.93 mL, another contains 14.0 mL and a third contains 10.6 mL. What is the total volume of the three beakers? Select the answer with the c
Which argument is Bismarck making in this excerpt
5x+7=-14+8x what is the value of x​
Does lennie admire George
I could really use your help for problem #1​
The diameter of our disk-shaped galaxy, the Milky Way, is about 1.0 x 10^5 light-years (ly). The distance to the Andromeda galaxy, which is the spiral galaxy ne
If 12 cubes are pulled away from a 1000 cubes block, how would u write the fraction representing the cubes that are left? How would write the decimal representi
18. Jodi drew a quick picture to model the answer for3.14 - 1.75. Draw what her picture might look like. (5.NBT.B.7)​
-2(m + 6) + 1 =3 solve for m
Energy is transferred between the atmosphere and hydrosphere by which two processes