sanishchamlagai0
sanishchamlagai0 sanishchamlagai0
  • 02-10-2021
  • Social Studies
contestada

which was the first hydropower situation of Nepal?​

Respuesta :

408478
408478 408478
  • 02-10-2021

Answer:

Pharping

Explanation:

The first hydropower project in Nepal was commissioned on 22nd May 1911 (inaugurated by late King Prithvi Bir Bikram Shah) in Pharping, about 10 km south of Kathmandu, using water from two spring sources, Satmule and Shikha Narayan3, with installed capacity of 500 kW.

Answer Link

Otras preguntas

what happens to the brightness of the light from each bulb as each new bulb is added?
what does the surface area represent in a cell
name three roles you play in your relationships with others. explain when you play each role.
Trent and Chris are musicians, and they recently played a concert for 20,000 fans. The rectangular venue measured 87 yards by 57 yards. What was the approximate
why do the two elements silver and iron have different properties?
How do u do this problem: W/6+5/8=-1 3/8 I got this answer: -1 53/64
The crew on fishing boat caught four fish weighing a total of 1092 pounds. The tarpon weighed twice as much as the amberjack and the white marlin weighed twice
Mr Jones has 20,000 to invest. He invests part at 6% and part at 7%, if hr earns 1,280 in interest after 1 year, how much did he invest at each rate.
How do you write 1.075 in 2 other forms?
how many thirds in 5