sadikshyapoudel015
sadikshyapoudel015 sadikshyapoudel015
  • 03-02-2022
  • Mathematics
contestada

a piece of work can be finished in 8 days, what part of the work is done in 2 days​

Respuesta :

kaseyafa
kaseyafa kaseyafa
  • 03-02-2022

Answer:

1/4 of the work

Step-by-step explanation:

A quarter (1/4) of the work is done in 2 days. Let's break it down:

Work can be finished in 8 days total so with 2 days it is only partially completed. If we set it up as 2/8 we can simplify to get 1/4. Therefore, we know only a quarter of the work is done so far.

Answer Link

Otras preguntas

The economy of a country has shown signs of overheating, such as high inflation rates. The government decides to implement fiscal policy. Which action should i
What types of atoms are in metallic bond?
When n's value is 5 calculate 6h + 7
Simplify This expression: (3+9)3 {The second 3 is an exponent}
What happened to the door knocker in a christmas carol?
Can an object be increasing in speed as it's acceleration decreases?
Based on what is known about Stalin from history, which statement from his speech is the best example of hypocrisy?
is We found the trinket within the old trunk adjective or adverb?
Sarah answered 85% of the trivia questions correctly. What fraction describes this percent
Why was Menlo Park, an industrial research lab, considered one of Edison’s greatest creations? A. It generated public demand for technology. B. It was the locat