A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

If I open a business to serve blind people then design the interior to be akin to an obstacle course, am I cruel? I’m graduated so my points are up for grabs ca
What measurement could be the length of a pool?
Right triangle abc is on a coordinate plane. segment ab is on the line y = 2 and is 6 units long. point c is on the line x = −3. if the area of δabc is 6 square
what is 6,389 divided by 27
What is the formula of Sodium Sulfide? A) Na3S₂ B) NaS₂ C) Na₂S D) Nas
How would ancient astronomers from Silla have observed the movement of stars and other objects compared to astronomers today?
How would ancient astronomers from Silla have observed the movement of stars and other objects compared to astronomers today?
85 POINTS!!!!!! Describe the graph of y = -|x + 4| - 5. 9(For 85 points it should at least be a sentence or two)
2+2 Im graduated, so my points are up for grabs cause I’ll never use them
Which graph represents the linear equation below y+1=2/3(x-6)