In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

The of the United States is the Federal Reserve. O A. federal bank O B. monetary policy O c. central bank O D. Board of Governors
What is the answer to this 20 / (20p ^ 2)
PLS HELP!!! ASAP The table below shows the depths at which an index fossil and three other fossils were found. Fossil Data Fossil Depth (meters) A 294 B 365 C
1. Agreement is normally evidenced by an offer and an acceptance.
Simplify the following expression. (5^3)^5
Dan jogs 4 miles in 36 minutes. At this rate, how long would it take him to jog 10 miles?
When thinking about GREs, applying to graduate school, and studying for mid-terms, Nichole starts to have sweaty palms and a racing heart. It is MOST probable t
1. A manufacturer of a printer determines that the mean number of days before a cartridge runs out of ink is 75 days, with a standard deviation of 6 days. Assum
$3,000 principal earning 5%, compounded annually, after 12 years
Prior to the 2004 Republican convention in New York, undercover officers infiltrated activist groups that they believed might cause problems during the conventi